Does every circuit end at the right site?
Get carrier circuits into NetBox with both sites attached. A reviewer approves the changes before circuit records are written.
Schedule a demo- 01
Check carrier circuit rows for gaps
Each circuit traces back to its carrier spreadsheet row.
Use the package
Confirm the installed circuits package.
Check the roots
Providers, types and sites must exist.
Keep the source
Each row keeps its file and line.
Works with
- 02
Match circuit providers and both sites
Proposed circuits wait for review; live records stay put.
Match foundations
Resolve providers, types and sites.
Check both ends
Each circuit needs A-side and Z-side sites.
Preview changes
Show adds, changes and conflicts.
- Approval gate · a person signs off03
Approve the circuit changes before saving
A reviewer approves or rejects the circuit changes.
See the review
Adds, changes and conflicts stay visible.
Approve or reject
A rejected stage is discarded.
Record the choice
The decision is saved for the run.
- 04
Save and check the approved circuits
Saved circuits checked against the approved changes.
Circuit records
Approved circuits are committed.
Both ends linked
A-side and Z-side sites are attached.
Rows checked
Committed rows match the preview.
See your own carrier circuits land in NetBox
A 20-minute walkthrough, no slides. We'll reply within one business day.

