Netos Playbook:Physical Inventory

Do your cabling records match the floor?

Get racks, power feeds and cables from your site survey into NetBox. Conflicts are shown, and no rack, feed or cable is saved until approved.

Schedule a demo
  1. 01

    Inspect existing racks, feeds and cables

    Check the racks and feeds behind existing cables.

    Look before loading

    Inspect racks, feeds and cables already there.

    Use the contract

    Confirm the installed physical import rules.

    Keep the source

    Each sheet and row stays traceable.

  2. 02

    Check the survey workbook against NetBox

    Missing survey sections add no rack, feed or cable rows.

    Only sent sections

    Absent workbook sections stage no rows.

    Check every row

    Keep warnings and source lines visible.

    Preview differences

    Show adds, changes and conflicts.

  3. Approval gate · approved in Atlas
    03

    Approve rack, feed and cable changes

    Rejected rack, feed and cable changes are discarded.

    One Import Review

    See counts and the linked run.

    Approve or reject

    A rejected stage is discarded.

    Keep the decision

    Approval is recorded on the run.

  4. 04

    Update and verify racks, feeds and cables

    Racks, power feeds and cables in NetBox, verified.

    Racks in place

    Approved rack rows are committed.

    Power feeds

    Power feed rows are committed.

    Cables checked

    Committed rows match the preview.

Book a demo

See your own site survey checked against NetBox

A 20-minute walkthrough, no slides. We'll reply within one business day.

What are you interested in? (optional)

We'll only use your details to reply.